top of page

Case Study done at Ang Mo Kio HDB Flat

Achieved 25.6% electrical savings with Ampere.Life

Discover Our Results

Case study done at Serangoon HDB flat

Achieve 12.7% savings with Ampere.Life

Commercial Air conditioning system

Achieved 19.9% savings with Ampere.Life

Case Study at Senja HDB Flat

Achieved 23% electrical savings with Ampere.Life

Installed on 10th Oct 2022

Commercial Building AHU Application

Achieved average 25% electrical savings with Ampere.Life

Commercial Convenience Store

Achieved average 25% to 30% savings with Ampere.Life

Certifications

Formosa Final Report

1806 Green River Energy Savings Verification Report

Hitachi Audit Report

NRST FnB Report

Taesek TUV Final Report

ALam Sentral Post NSRT Report

bottom of page